The goal of phase 4 is to wrap up the testing specification workshop by giving feedback to another group on their test specification and receiving feedback from that group as well. Based on the comments and suggestions you receive, your group can decide what to accept and modify to polish your final spec. While giving peer review, please be sure to give clear and logical feedback in a respectful manner by each due date.
For this phase you will need the following resources:
Google Docs
Buddymeeting
Trouble Shooting Your Spec Exchange
FAQs
How This Process Works:
1. Once your test specification is prepared for peer review, post a comment on the phase four comment box that states “Name of Test ready for review.”
2. The next group to post a comment will be the partner group.
3. Both groups must have their test specifications uploaded to Google Docs.
4. Once uploaded, both specifications must be shared with each member of both the authoring group and the partner group.
5. Now that each group in the pair has access to the other’s test specification, each should schedule a time to meet through Buddymeeting in order to post comments and suggestions on the other group’s test specification via Google docs.
6. After both groups have commented on the other’s specification, the groups should schedule a Buddymeeting in order to discuss the comments made on both test specifications.
7. With the new feedback, a final version should be prepared and submitted to Professor Davidson by the deadline (deadline pending) above.
1. Exchanging the specs:
1.1 Each group uploads their spec to google docs
1.2 One member from each group invites all group members from both teams to view the document (you will all need to have Gmail accounts in order to view the spec in Google Docs).
1.3 Once your team has the draft from the other group, save the spec and upload it as a separate google docs document that only your team has access to. Make your comments on this new document. (see step 2)
1.4 Once you have finalized your comments and before you meet with the other group, share the commented spec with its authors.
2. Creating the feedback:
2.1 All feedback should be left through either:
A: The comment function
A1: Insert - Comment
or B: Colored font
2.2 Do NOT make changes to the actual spec as Google Docs won’t track your changes.
3. Submitting the spec
3.1 Submit the final spec draft through email
4. Troubleshooting problems
4.1: My graphic/chart won’t show up in my uploaded Google Docs file
4.1.1 Save your image into .JPG format and insert it into your Google Docs document
4.1.2 For graphic content from MSWord:
4.1.3 copy the object to the clipboard (select, right click, and copy the object)
4.1.4 Paste the object into a paint program (ctrl+v)
4.1.5 Save the image a .JPG
4.1.6 Insert into Word and upload to Googledocs
Q. Can I work on specs in Google Docs with my phone?
A. Yes. View the Google's information page for more information.
Example Comment: 3rd Grade Vocabulary ready for review.
ReplyDelete